Your position: Home > Case

YDF 750KG Waste Incinerator Running in Azerbaijan


YDF 750kg/hour medical waste incinerator project in Azerbaijan is used for hazardous and healthcare waste disposal. 

1. Capacity: 750 kg/batch

2. Continuous operation: 3-4 cycles per day

3. High combustion efficiency

4. Secondary combustion chamber for cleaner emissions

5. Stable and durable structure

6. Easy operation and maintenance

7. Environmentally friendly design 

( Factory Product Testing Before Shipment )

waste incinerator,china incinerator,oil gas fired incinerator

( Easy Installation Work )

medical incinerator,large incinerator furnace,waste management incinerator 

Watch Video


Previous:  Mobile Containerized Medical Waste Incinerator 300kg/Hour
Next:  Large Medical Waste Incinerator Furnace 750kg In Libya
Copyright © Henan Yuanda Boiler Corporation Ltd. All Rights Reserved Site Index     Privacy policy